Getting ready to move to the airport
Next weekend we will be moving everything to the airport. My hangar is #101 at Chino. Feel free to stop by if you live in the area. It is about a 25 mile trip to the airport so I am bolting as much on the RV as I can to eliminate too many trips.


My New Office
There are still many things to do in there. I have to cover the glare shield and install the carpet up front. I am looking forward to getting the wings on for good.

Left Front
You will note in this picture that I installed an access panel up front. This was a life saver when installing the avionics and electrical. This was an engineered access panel and is structurally sound.

Another View Looking Forward
This is the view that I will be looking at most of the time. After painting and repainting I think that I finally got it right.

Lower Cowl & Spinner
This is my Props Inc. wood prop. I purchased this prop used. It has around 200 hours of flight time on it. I will be ordering a new metal prop soon.

September 7,2002 Moved to Chino
This was the day that I have been waiting for for over 5 years. It was a 25 mile trip to Chino. We made 2 trips. Everything went smooth. Couldn't even tell we had an airplane back there. Well almost. We did get many thumbs up as cars went by us.

N193RV In The Hangar At Last
We made it safe and sound. I spent the rest of the weekend organizing things at the hangar. Next weekend the wings will go on. YEEEEEEE HAAA!!!!!!

The Left Wing Is On
Last weekend 9/15/02 I installed the left wing. It was only 150 degrees in the hangar that day. All the normal people who hang out at the airport on weekends went home to take a swim to cool off. It took me almost 2 hours to install the bolts on one side. Next weekend the right wing will go on and the RV will be taken off of the jacks. You think that I am getting excited???????????????????????